Those railway line works

The Overground Line from Barking to Gospel Oak has been closed for months while the line is being electrified, which will bring it into the same system as the rest of the London Overground. It will add the possibility of four- rather than two-carriage trains and so relieve the crush at busy times. The line through SoTo station has been closed since September, due to re-open in ‘February 2017’ so the end is nigh.  To understand why it’s taking so long,. see this article from Rail Engineer magazine, it’s a massive engineering project.

bogrug1bogrug2bogrug3Rail Engineer – Issue 143 – September 2016

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s